2019
DOI: 10.1007/978-3-030-16134-7_11
|View full text |Cite
|
Sign up to set email alerts
|

Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…However, these requirements are often user specific. In order to discuss the validity of the concept described in this article, several requirements developed in the industrial case study described in [8] were adopted as references. Given Further requirements are described in [8].…”
Section: Requirementsmentioning
confidence: 99%
See 2 more Smart Citations
“…However, these requirements are often user specific. In order to discuss the validity of the concept described in this article, several requirements developed in the industrial case study described in [8] were adopted as references. Given Further requirements are described in [8].…”
Section: Requirementsmentioning
confidence: 99%
“…In order to discuss the validity of the concept described in this article, several requirements developed in the industrial case study described in [8] were adopted as references. Given that Teamcenter is the PLM tool and Polarion is the ALM tool, the following requirements must be fulfilled: Further requirements are described in [8]. However, they are highly specific to the industrial case study.…”
Section: Design and Implementationmentioning
confidence: 99%
See 1 more Smart Citation