2013
DOI: 10.1016/j.compchemeng.2013.03.007
|View full text |Cite
|
Sign up to set email alerts
|

Development and economic assessment of different WWTP control strategies for optimal simultaneous removal of carbon, nitrogen and phosphorus

Abstract: This paper presents the comparison of four control strategies for the A 2 /O WWTP configuration for simultaneous C, N and P removal. The control strategies: i) external COD-P control; ii) external recycle flow-P control; iii) nitrate control in the last anoxic reactor; iv) ammonia control in the last aerobic reactor, were combined with other common control loops to build different control structures and were simulated in Matlab/Simulink under different influent conditions. A systematic approach was conducted w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
22
0
1

Year Published

2013
2013
2022
2022

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 43 publications
(26 citation statements)
references
References 44 publications
0
22
0
1
Order By: Relevance
“…Sludge may be stabilized by anaerobic or aerobic digestion, and/or by chemical or thermal sterilization. Sludge treatment charges reported in the literature vary from about 0.2 € kg À1 of dry sludge [38,54,60] to around 0.5 € kg À1 [36,45,46,68].…”
Section: Sludge Disposal/valorizationmentioning
confidence: 99%
See 4 more Smart Citations
“…Sludge may be stabilized by anaerobic or aerobic digestion, and/or by chemical or thermal sterilization. Sludge treatment charges reported in the literature vary from about 0.2 € kg À1 of dry sludge [38,54,60] to around 0.5 € kg À1 [36,45,46,68].…”
Section: Sludge Disposal/valorizationmentioning
confidence: 99%
“…the maximum flow rate that can be delivered by the available pumps. Among papers dealing with existing ASPs upgrading, only Ostace and coworkers [54] have incorporated equipment related costs in the objective function. Their study aimed at comparing the optimal performance of several control systems, suggesting that the necessary equipment was not purchased yet.…”
Section: Economic Criterionmentioning
confidence: 99%
See 3 more Smart Citations