The article is devoted to the substantiation of the line of action for reclamationof disturbed lands. The object of reclamation is a land plot (Russia, Leningrad Region), disturbed as a result of unauthorized open-pit mining operations for the extraction of limestone. In order to obtain the information necessary to justify the reclamation project, the following works were carried out: reconnaissance and route observations, topographic, geological, and environmental surveys of the land. Based on the results of the generalized study data of the environmental and economic justification, a line of action for agricultural reclamation was chosen. In addition, an assessment of the estimated cost of the event was carried out and a list of necessary works was proposed within the framework of the technical and biological stages of reclamation.