Computing in Civil Engineering (2011) 2011
DOI: 10.1061/41182(416)85
|View full text |Cite
|
Sign up to set email alerts
|

Development of 5D CAD System for Visualizing Risk Degree and Progress Schedule for Construction Project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…The proposed framework was implemented for the prevention of falling-from-heights accidents. Kang et al [11] linked a 4D model with risk data to visualize the risks in each activity. Their system considers construction cost, duration and safety as risk factors.…”
Section: D Safety Planning Systemsmentioning
confidence: 99%
“…The proposed framework was implemented for the prevention of falling-from-heights accidents. Kang et al [11] linked a 4D model with risk data to visualize the risks in each activity. Their system considers construction cost, duration and safety as risk factors.…”
Section: D Safety Planning Systemsmentioning
confidence: 99%
“…The growing implementation of BIM in the AEC industry is changing the way that safety planning is approached. Kang et al [23] proposed building a 5D CAD-based risk visualization system for visualizing the degree of construction risk. Furthermore, Zhang et al [17] designed an automated rule-based checking system for safety planning and simulation by applying algorithms to BIM.…”
Section: Literature Reviewmentioning
confidence: 99%