2015
DOI: 10.1016/j.mineng.2015.07.018
|View full text |Cite
|
Sign up to set email alerts
|

Development of a techno-economic simulation tool for an improved mineral processing plant design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
3
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 18 publications
0
3
0
Order By: Relevance
“…Techniques such as Global Sensitivity Analysis (GSA) and technoeconomic simulation tools present options 3,4 for improving operations at the design stage (see also Chapter 9). 1 Substantial delays of several years and resultant lost productivity may arise from this issue.…”
Section: Refractory Ore Processingmentioning
confidence: 99%
“…Techniques such as Global Sensitivity Analysis (GSA) and technoeconomic simulation tools present options 3,4 for improving operations at the design stage (see also Chapter 9). 1 Substantial delays of several years and resultant lost productivity may arise from this issue.…”
Section: Refractory Ore Processingmentioning
confidence: 99%
“…Moreover, cost models could be used in flow sheet simulations applied in design and optimization. Models of unit operations built into the simulators could be improved by linking the equipment cost models (Khalesi et al, 2015).A number of approaches can be employed with the aim of developing the cost models. A review of these methods can be found in recent papers by Niazi et al (2006) and Huang, Newnes, and Parry (2012).…”
mentioning
confidence: 99%
“…Moreover, cost models could be used in flow sheet simulations applied in design and optimization. Models of unit operations built into the simulators could be improved by linking the equipment cost models (Khalesi et al, 2015).…”
mentioning
confidence: 99%