2013
DOI: 10.1016/j.engappai.2012.11.010
|View full text |Cite
|
Sign up to set email alerts
|

Development of an optimization model for water resources systemsplanning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 28 publications
0
0
0
Order By: Relevance
“…The parameters of the optimal operation model of water resources were expressed in the form of definite values in the above researches, without considering the uncertainties in the actual operation of the water transfer project. However, in actual water resources management and planning problems, uncertainties may present in terms of multiple formats and exist on multiple levels [3]. As for the current operating operation model of the Jiaodong Water Transfer Project, since it has been completed and operated for more than 30 years, due to sediment, grass in summer, freezing in winter, and other reasons, Discharge Capacity (DC) has changed gradually, which has deviated from its design value.…”
Section: Introductionmentioning
confidence: 99%
“…The parameters of the optimal operation model of water resources were expressed in the form of definite values in the above researches, without considering the uncertainties in the actual operation of the water transfer project. However, in actual water resources management and planning problems, uncertainties may present in terms of multiple formats and exist on multiple levels [3]. As for the current operating operation model of the Jiaodong Water Transfer Project, since it has been completed and operated for more than 30 years, due to sediment, grass in summer, freezing in winter, and other reasons, Discharge Capacity (DC) has changed gradually, which has deviated from its design value.…”
Section: Introductionmentioning
confidence: 99%