2021
DOI: 10.1016/j.autcon.2021.103680
|View full text |Cite
|
Sign up to set email alerts
|

Development of formwork automation design software for improving construction productivity

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(7 citation statements)
references
References 18 publications
0
4
0
Order By: Relevance
“…The traditional cast-in-place construction has become an unfavorable approach in practice due to the harm to the built environment and high resource consumption (Abbasnejad et al, 2020;Jiang, 2021;Lee, 2021). To achieve a higher building efficiency and a lower carbon emission footage, the need for novel construction approaches using modular and prefabrication has been highly demanded (Gharbia, et al, 2020;Pan & Pan, 2020;Pradhananga et al, 2021;Zhou et al, 2019).…”
Section: Introductionmentioning
confidence: 99%
“…The traditional cast-in-place construction has become an unfavorable approach in practice due to the harm to the built environment and high resource consumption (Abbasnejad et al, 2020;Jiang, 2021;Lee, 2021). To achieve a higher building efficiency and a lower carbon emission footage, the need for novel construction approaches using modular and prefabrication has been highly demanded (Gharbia, et al, 2020;Pan & Pan, 2020;Pradhananga et al, 2021;Zhou et al, 2019).…”
Section: Introductionmentioning
confidence: 99%
“…The FWS provides the geometry and strength that concrete demands to obtain the shape and the structural design properties of the cured concrete [5]. In addition, FWSs have a significant impact on the time and cost performance of RC structures since formwork activities are performed continuously throughout the construction process [6]. Indeed, the FWS can account for up to two-thirds of the total cost of the RC structural frame [7] and it can have a major impact on the total duration of the project as the FWS affects the floor cycle time of building construction projects [8].…”
Section: Introductionmentioning
confidence: 99%
“…Compared to permanent structures, temporary formwork systems are more fragile and require sufficient strength, stiffness, and stability [3]. The quality inspection of formwork systems is an essential construction management procedure that examines, measures, and gauges whether the characteristics (e.g., number, size, and spacing) of installed formwork systems properly meet specific design requirements.…”
Section: Introductionmentioning
confidence: 99%