2015
DOI: 10.1016/j.promfg.2015.11.042
|View full text |Cite
|
Sign up to set email alerts
|

Development of Integrated Model for Managing Risk in Lean Manufacturing Implementation: A Case Study in an Indonesian Manufacturing Company

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
23
0
8

Year Published

2017
2017
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 28 publications
(31 citation statements)
references
References 12 publications
0
23
0
8
Order By: Relevance
“…The same test was made for aerospace industry, too. Engineers [66] implemented lean manufacturing to a company, which produces aerospace equipment in Indonesia. They defined risk as any event that may prevent any project or activity to achieve its objective.…”
Section: Implementation and Impact Of Lean Manufacturingmentioning
confidence: 99%
“…The same test was made for aerospace industry, too. Engineers [66] implemented lean manufacturing to a company, which produces aerospace equipment in Indonesia. They defined risk as any event that may prevent any project or activity to achieve its objective.…”
Section: Implementation and Impact Of Lean Manufacturingmentioning
confidence: 99%
“…This can be considered as a burden to Lean, since the waste in human intellectual is neglected easily. Some companies even use unqualified human-resources for production process, in order to cut down the production price, thus leads to the difficulty of LM employment (Widiasih, Karningsih and Ciptomulyono, 2015). In construction industry in Malaysia, the cheap cost of employment is reported as an encouraging factor for labor-intensive usage production method than innovative ones, creating more waste (CIDB MALAYSIA, 2008;Marhani, Jaapar and Bari, 2012).…”
Section: Labor Costmentioning
confidence: 99%
“…Meanwhile, the others in V4 focus more on prepare the logical thinking of workforce, what is the right sequence, the right method, root cause, etc. The most frequent reason for a project failure is the inability to deliver LM training material/knowledge to the employees, with the lack of a growth mindset (Widiasih, Karningsih and Ciptomulyono, 2015;Minh and Ha, 2016;Pearce, Pons and Neitzert, 2018). The lack of communication for knowledge and information can lead to the result that employee cannot feel the benefit directly of implementing LM, thus undermined personnel commitment, or lead to misunderstanding (Wong, Wong and Ali, 2009), (Lila, 2012) report the situation in Thailand automotive industry, that the level of understanding lean concepts positively depends on the education and experience of key employees.…”
Section: Awarenessmentioning
confidence: 99%
See 1 more Smart Citation
“…The assessment for every item was in a Likert scale [30], because it is a popular method used for studying different aspects of the manufacturing industry, as in risks management in lean manufacturing implementation [31], the incremental contribution of lean management accounting practices [32], and the effects of manufacturing technologies and lean practices on manufacturing operational performance [33]. In this research, we relied on a fivepoint Likert scale to assess the importance of SMED activities.…”
Section: Survey Administrationmentioning
confidence: 99%