2018
DOI: 10.20965/ijat.2018.p0822
|View full text |Cite
|
Sign up to set email alerts
|

Disassembly Reuse Part Selection for Recovery Rate and Cost with Lifetime Analysis

Abstract: The depletion of natural resources is a critical environmental issue, and the recovery, including reuse and recycling, of end-of-life assembled products is the key to reducing the use of natural resources. However, in order to reuse or recycle an assembled product, it is essential to consider the life expectancy or material type and the weight of the parts in the product. In addition, because the assembled products comprise various parts, manual disassembly is required, which entails high costs. To recover ass… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 23 publications
0
2
0
Order By: Relevance
“…However, several factors can prevent companies from disassembling, e.g. the petite size of the components, the lower economic value of the disassembled components, and the high difficulty level for component recycling or disassembly [49]. Thus, the economic factor in the disassembly process should also be considered [50].…”
Section: Disassemblymentioning
confidence: 99%
“…However, several factors can prevent companies from disassembling, e.g. the petite size of the components, the lower economic value of the disassembled components, and the high difficulty level for component recycling or disassembly [49]. Thus, the economic factor in the disassembly process should also be considered [50].…”
Section: Disassemblymentioning
confidence: 99%
“…Disassembly papers can be classified to papers with and without life cycle option. In other words, some studies like [10; 11] have considered life cycle option while [12] did not study the life cycle subject. The authors only focused on reduction of disassembly costs and solving the presented mathematical model with a metaheuristics algorithm.…”
Section: Introduction and Related Workmentioning
confidence: 99%