2017
DOI: 10.1016/j.epsr.2016.12.016
|View full text |Cite
|
Sign up to set email alerts
|

Distribution system planning to accommodate distributed energy resources and PEVs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
23
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 42 publications
(23 citation statements)
references
References 36 publications
0
23
0
Order By: Relevance
“…The planning results suggest that optimal allocations of ESSs and capacitors are beneficial to improving penetration and utilization level of RDGs and achieving the upgrade deferral. Similar with [75], the benefits brought by optimal allocation of voltage control devices on accommodation of RDGs are also verified in [41,68,79,88,96]. …”
Section: Planning Objectivesmentioning
confidence: 57%
See 3 more Smart Citations
“…The planning results suggest that optimal allocations of ESSs and capacitors are beneficial to improving penetration and utilization level of RDGs and achieving the upgrade deferral. Similar with [75], the benefits brought by optimal allocation of voltage control devices on accommodation of RDGs are also verified in [41,68,79,88,96]. …”
Section: Planning Objectivesmentioning
confidence: 57%
“…Correspondingly, the planning horizons of them are 16-30 years [35,41,52,64], 6-15 years [34,42,59,61,71,96,97], and 1-5 years [31,38,43,67,84,86], respectively. In most of the articles, capital recovery factor is adopted to calculate the net present value of equal annual cash flows and economic objectives.…”
Section: Methods To Deal With Multiple Time Scalesmentioning
confidence: 99%
See 2 more Smart Citations
“…Constraints (2), (3) represent electricity and natural gas power balance in each EH. Constraints (4.a)-(4.c) set the bounds on the output power of EHs' components to their capacity and (4.d) is to limit penetration of CHP units within the electricity distribution network [21][22][23][24]. Capacity of EHs' components in each time stage is determined based on their capacity in previous time stage and newly added capacity using (5.a)-(5.c).…”
Section: Expansion Planning Of Energy Hubsmentioning
confidence: 99%