2020
DOI: 10.1007/s10479-020-03653-1
|View full text |Cite
|
Sign up to set email alerts
|

Due-window assignment scheduling in the proportionate flow shop setting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(3 citation statements)
references
References 31 publications
0
3
0
Order By: Relevance
“…The manager assigns a certain amount of additional resources to the job to reduce and control the processing time of the artifact. Common limited resources are the financial budget, energy, fuel, or manpower (see Vixkson [8]; Shabtay and Kasoi [9]; Wang and Cheng [10]; Shabtay and Steiner [11]; Zhang et al [12]; Wang et al [13]). In production, due to machine failure or the processing time being too long, wear will inevitably occur and reduce the working rate, so maintenance activities can be carried out to reduce the job processing time (see Lee and Leon [14]; Wang and Wang [15]; Mosheiov and Sidney [16]; Bai et al [17]; Yin et al [18]; and Strusevich and Rustogi [19]).…”
Section: Introductionmentioning
confidence: 99%
“…The manager assigns a certain amount of additional resources to the job to reduce and control the processing time of the artifact. Common limited resources are the financial budget, energy, fuel, or manpower (see Vixkson [8]; Shabtay and Kasoi [9]; Wang and Cheng [10]; Shabtay and Steiner [11]; Zhang et al [12]; Wang et al [13]). In production, due to machine failure or the processing time being too long, wear will inevitably occur and reduce the working rate, so maintenance activities can be carried out to reduce the job processing time (see Lee and Leon [14]; Wang and Wang [15]; Mosheiov and Sidney [16]; Bai et al [17]; Yin et al [18]; and Strusevich and Rustogi [19]).…”
Section: Introductionmentioning
confidence: 99%
“…e weight of the processing queue can be increased when the production efficiency of a certain period of time needs to be improved. For example, in the Didi taxi dispatching (a similar mode to Uber), orders placed in the morning offer a higher bonus to the driver, which can effectively improve customer satisfaction in these locations by better meeting the needs of customers going to work in the morning [30]." In this article, the results of Wang et al [21] are extended to the case of the due-window assignment with positiondependent weights (Wang et al [24], Wang et al [25], and Wang et al [31]).…”
Section: Introductionmentioning
confidence: 99%
“…Error results of the algorithms for T max . unrelated parallel machines (Sun et al[32]), extending the models to scheduling with variable processing times (Wang et al[33]), or considering the lateness/earliness objective functions (Liang et al[34], Wu et al[35], Wu et al[36], Sun et al[37], Lv et al[38], Wang et al[39]). …”
mentioning
confidence: 99%