An electromechanical method is proposed to avoid peak dynamic loads in a steady state, the condition of smooth start and emergency stop, as well as correction of the scraper conveyor productivity depending on the load flow level of the blasting combine, which will increase the reliability and reduce the energy and metal consumption of the transport link of the mining complex.