2018
DOI: 10.22146/ijitee.35028
|View full text |Cite
|
Sign up to set email alerts
|

Effect of Load Growth on PLTH Baron Techno Park Performance

Abstract: The reliability of stand-alone and hybrid power plant systems was dependent on electrical loads that the system must supply. For example, on renewable energy sources (RES), Reviews of those systems needs to be calculated well before the development process. One of the most important processes in the initial calculation is the electrical load that must be supplied by the system. The electrical load has a major influence on the amount of power generating capacity. A power plant that has higher electricity produc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 3 publications
0
0
0
1
Order By: Relevance
“…Salah satu yang dikembangkan adalah sistem pembangkit listrik tenaga bayu atau angin. Sistem pembangkit energi angin tersebut telah disinkronkan dengan energi surya menjadi sumber energi hybrid [2] untuk memasok kebutuhan energi listrik di KST tersebut [3].…”
Section: Pendahuluanunclassified
“…Salah satu yang dikembangkan adalah sistem pembangkit listrik tenaga bayu atau angin. Sistem pembangkit energi angin tersebut telah disinkronkan dengan energi surya menjadi sumber energi hybrid [2] untuk memasok kebutuhan energi listrik di KST tersebut [3].…”
Section: Pendahuluanunclassified