Effects of dam break on downstream dam and lands using GIS and Hec Ras: a decision basis for the safe operation of two successive dams

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 19 publications
0
4
0
Order By: Relevance
“…From November 1961 to 1978, the dam's catchment covers 16463.1 km 2 , which is also the sedimentation catchment of its reservoir (CRSed). In 1978, Iran built the first dam (Vahdat dam) within the catchment of the Darbandikhan dam [55]. Vahdat dam leads to a decrease in the CRSed to 15,403.5 km 2 .…”
Section: Darbandikhan Basinmentioning
confidence: 99%
“…From November 1961 to 1978, the dam's catchment covers 16463.1 km 2 , which is also the sedimentation catchment of its reservoir (CRSed). In 1978, Iran built the first dam (Vahdat dam) within the catchment of the Darbandikhan dam [55]. Vahdat dam leads to a decrease in the CRSed to 15,403.5 km 2 .…”
Section: Darbandikhan Basinmentioning
confidence: 99%
“…Hydrological modeling of the ow pattern in the studied waterway was performed using the HEC-RAS model. The HEC-RAS software is a runoff simulator model that solves St. Venent equations in steady and unsteady ows and calculates ow characteristics (Amini et al 2021). For simulation, it is necessary to de ne three main data sets, including geometric and ow data, and the type of modeling.…”
Section: Hec-ras Modelmentioning
confidence: 99%
“…In some structures, elements such as "Ineffective Flow Area" and "Abstractions" were used in the cross-sections upstream of the structure. To perform ood routing calculations, it is necessary to generate at least two cross-sections inside the check dam reservoir (Amini et al 2021). These two crosssections were selected immediately above the structure and at the beginning of the reservoir.…”
Section: Figure 2a) Longitudinal Pro Le Of the Main Waterway And B) G...mentioning
confidence: 99%
“…Since the volume, flow and speed of the flood resulting from a dam failure can be high, the damage to both natural and artificial lands, as well as the downstream areas of the dam, can be extremely large. Thus, it is essential to conduct research on dam failure, including parameters, route and flood development, to ensure downstream safety management, particularly due to disruptions of residential areas upstream of dam rupture (Amini, Bahrami, & Miraki, 2021). The most basic task of dam rupture analyses is estimating and guiding the breach out hydrograph (Wu et al, 2011).…”
Section: Introductionmentioning
confidence: 99%