Effects of Project Manager Competency on Green Construction Performance: The Chinese Context

Abstract: Project manager competency is a key factor determining the success of a project. With the deterioration of the environment, green buildings have come into being. Compared to traditional buildings, green buildings encounter more complex problems during the construction process, and project managers are faced with greater challenges. Existing research on the evaluation of project manager competency based on green building construction (GBC) is scarce. Thus, the aim of this paper is to evaluate project manager co… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

3
31
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
3
1

Relationship

1
8

Authors

Journals

citations
Cited by 51 publications
(34 citation statements)
references
References 48 publications
3
31
0
Order By: Relevance
“…Finally, this research also highlights the positive relationship between process integration and green building design development.Sustainability 2020, 12, 2276 2 of 16 of necessary inputs and integrate them to meet pre-defined objectives [18]. During the last years, several research studies have analyzed project management processes to optimize green building projects focusing on various aspects, such as leadership factors [19,20], building information modelling implementation [12,21], lean construction [13,14], economic value [22], schedule performance [23], procurement approaches [24], rating systems [3], best practices [11], project-based organizations [25], processes [1], design teams [26], and design development [27,28].The management of the design phase is especially critical within the facility lifecycle, as any later changes will produce cost overruns and delays [12,29]. Designers involved in the development of projects based on international green building standards face additional challenges, primarily the need for additional design time, uncertainty regarding special equipment and materials, inclusion of green requirements in the contractual specifications, and planning green activities within the general master plan [1,8,29].…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…Finally, this research also highlights the positive relationship between process integration and green building design development.Sustainability 2020, 12, 2276 2 of 16 of necessary inputs and integrate them to meet pre-defined objectives [18]. During the last years, several research studies have analyzed project management processes to optimize green building projects focusing on various aspects, such as leadership factors [19,20], building information modelling implementation [12,21], lean construction [13,14], economic value [22], schedule performance [23], procurement approaches [24], rating systems [3], best practices [11], project-based organizations [25], processes [1], design teams [26], and design development [27,28].The management of the design phase is especially critical within the facility lifecycle, as any later changes will produce cost overruns and delays [12,29]. Designers involved in the development of projects based on international green building standards face additional challenges, primarily the need for additional design time, uncertainty regarding special equipment and materials, inclusion of green requirements in the contractual specifications, and planning green activities within the general master plan [1,8,29].…”
mentioning
confidence: 99%
“…Sustainability 2020, 12, 2276 2 of 16 of necessary inputs and integrate them to meet pre-defined objectives [18]. During the last years, several research studies have analyzed project management processes to optimize green building projects focusing on various aspects, such as leadership factors [19,20], building information modelling implementation [12,21], lean construction [13,14], economic value [22], schedule performance [23], procurement approaches [24], rating systems [3], best practices [11], project-based organizations [25], processes [1], design teams [26], and design development [27,28].…”
mentioning
confidence: 99%
“…Yusliza et al (2020) report that CCP are largely expected to lead to HSP. Also, Sang et al (2018) acknowledged that the technology involved in GCPs is complex but not highly unsafe.…”
Section: Mediating Effect Of Health and Safety Performance On The Relationship Between Green Construction Practices And Client Satisfactimentioning
confidence: 99%
“…First the heightened cost of green construction practices and materials limits the initial capital cost of green construction in highway projects. The higher costs are associated with high-cost materials as well as the high costs of green construction technologies [36]. Slow developing economies have no incentive to engage in green construction management.…”
Section: Challenges In Maintaining Green Constructionmentioning
confidence: 99%