2009 International Conference on Computers &Amp; Industrial Engineering 2009
DOI: 10.1109/iccie.2009.5223854
|View full text |Cite
|
Sign up to set email alerts
|

Effects on undershoots and lost sales on the cycle service level for periodic and continuous review policies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 10 publications
0
5
0
Order By: Relevance
“…The current state Value Stream Mapping (VSM) is arranged as shown in Figure 2, with the cycle time of delivering the fertilizer obtained from the bagging to the loading processes at 9030 seconds with 7130 seconds value-added activity. Table 1 shows the waste identification process, which is calculated to get a 28.2% After identifying the time wasted in the sales warehouse, the 5 why's tools were used to analyze the root cause for recommendation and improvement, as shown in Table 2 [9].…”
Section: Resultsmentioning
confidence: 99%
“…The current state Value Stream Mapping (VSM) is arranged as shown in Figure 2, with the cycle time of delivering the fertilizer obtained from the bagging to the loading processes at 9030 seconds with 7130 seconds value-added activity. Table 1 shows the waste identification process, which is calculated to get a 28.2% After identifying the time wasted in the sales warehouse, the 5 why's tools were used to analyze the root cause for recommendation and improvement, as shown in Table 2 [9].…”
Section: Resultsmentioning
confidence: 99%
“…Where CSL is cycle service level or the possibility of how much inventory can meet consumer demand so that stockouts do not occur (Achkar et al, 2024;Cardós et al, 2009). The CSL value determined by PT xyz is 90%.…”
Section: Inventory Managementmentioning
confidence: 99%
“…Inventory management policies in companies with random demand fluctuations are divided into two categories, namely continuous review policy and periodic review policy. Continuous review policies are more expensive in terms of costs than periodic policies, but continuous checks are very useful for achieving and maintaining the desired level of service from slow moving materials [10].…”
Section: Re-order Pointmentioning
confidence: 99%