2014
DOI: 10.1007/s10732-014-9262-1
|View full text |Cite
|
Sign up to set email alerts
|

Efficient heuristics for the workover rig routing problem with a heterogeneous fleet and a finite horizon

Abstract: Onshore oil fields may contain hundreds of wells that use sophisticated and complex equipments. These equipments need regular maintenance to keep the wells at maximum productivity. When the productivity of a well decreases, a specially-equipped vehicle called a workover rig must visit this well to restore its full productivity. Given a heterogeneous fleet of workover rigs and a set of wells requiring maintenance, the workover rig routing problem (WRRP) consists of finding rig routes that minimize the total pro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
12
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(12 citation statements)
references
References 24 publications
0
12
0
Order By: Relevance
“…Constraint (23) ensures that the start of the intervention in each well occurs only once by a rig at a specific time. Constraint (24) ensures that a maximum of N interventions are performed at a specific time and that there is no interference between the allocations of the wells to rigs.…”
Section: Decomposed Mathematical Modelmentioning
confidence: 99%
“…Constraint (23) ensures that the start of the intervention in each well occurs only once by a rig at a specific time. Constraint (24) ensures that a maximum of N interventions are performed at a specific time and that there is no interference between the allocations of the wells to rigs.…”
Section: Decomposed Mathematical Modelmentioning
confidence: 99%
“…According to Ribeiro et al (2014), in large oil fields, many wells require maintenance at the same time, so oil companies need more than one rig to service the wells as soon as possible. However, the rent of workover rigs is very expensive and so is the cost of having them available in standby mode.…”
Section: Opening Remarksmentioning
confidence: 99%
“…Since well productivity is reduced, a request of maintenance describing the type of maintenance necessary and the production loss rate is issued. The maintenance is performed by a specially-equipped vehicle called a workover rig (or just rig) which carries external equipment to perform services such as mud preparation and power generation (RIBEIRO et al, 2014).…”
Section: General Descriptionmentioning
confidence: 99%
“…Its basic idea is to use a leaning mechanism to bias the selection of a variety of removal and insertion operators that are used to generate new solutions. It has been widely used to solve various variants of VRPs [26][27][28][29][30][31][32][33][34][35]. In this paper, we incorporate the features of the proposed problem into the ALNS.…”
Section: Solution Approachmentioning
confidence: 99%