Electrical Measurements During Magnet Construction

Abstract: Throughout the construction phase of the cold mass for SSC magnecs, electrical tests are made to determine that no faulrs in the coil structure have developed. These tests include ones designed to measure turn-to-turn voltage hold-off, hypot tests to ground, coil resistance, and instrumentation checks. These various tests will be described and the cest parameters that are used will be covered.Electrical tests are performed throughout the magnet assembly and fabrication process to verify that coil integrity and… Show more