2016
DOI: 10.1109/tsg.2016.2572639
|View full text |Cite
|
Sign up to set email alerts
|

Energy and Reserve Scheduling Under Wind Power Uncertainty: An Adjustable Interval Approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
35
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 64 publications
(35 citation statements)
references
References 25 publications
0
35
0
Order By: Relevance
“…f min i is the fuel cost corresponding to the minimum output of the unit i. K i,t,m is the slope of the unit i at the segment m in period t. P i,t,m is the output of unit i at the segment m in period t. Binary variables u i,t and v i,t are introduced to linearize C SU i,t in Equation (6). u i,t is the start-up status variable, for which 1 means that the unit is in the boost process.…”
Section: Objectivementioning
confidence: 99%
See 3 more Smart Citations
“…f min i is the fuel cost corresponding to the minimum output of the unit i. K i,t,m is the slope of the unit i at the segment m in period t. P i,t,m is the output of unit i at the segment m in period t. Binary variables u i,t and v i,t are introduced to linearize C SU i,t in Equation (6). u i,t is the start-up status variable, for which 1 means that the unit is in the boost process.…”
Section: Objectivementioning
confidence: 99%
“…Thus, Equation (6) can be transformed into the linear expression shown in Equation (8): Figure 2 shows the probability density distribution curve of wind power, in which w t , w t and w t represent the scheduled wind power, upper and lower bound of confidence interval at time t, respectively. in Equation (6). ui,t is the start-up status variable, for which 1 means that the unit is in the boost process.…”
Section: Objectivementioning
confidence: 99%
See 2 more Smart Citations
“…On the one hand, wind power output is featured by volatility and anti-peak. Therefore, how to deal with the impact of wind power penetration on the economic dispatch of the power system is a valuable topic that deserves further study [1][2][3][4]. On the other hand, the links between regional power grids are getting closer and closer through the ultrahigh voltage (UHV) DC transmission, and meanwhile the requirements for the communication capabilities of power grids are getting higher and higher accordingly.…”
Section: Introductionmentioning
confidence: 99%