2010
DOI: 10.2175/193864710798194094
|View full text |Cite
|
Sign up to set email alerts
|

Energy Efficiency Drives the Selection of Tertiary Nitrifying MBR (T-MBR) for the World's Largest Membrane Facility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2011
2011
2012
2012

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Two treatment alternatives including the MBR/MF (MBR treating half of the primary effluent with a filtration system filtering nitrified secondary effluent from the existing system) and the Tertiary Nitrifying MBR (T-MBR, MBR to treat all the non-nitrified secondary effluent from the existing system) were selected for installation at the Woodward Avenue Wastewater Treatment Plant (WWTP) in Hamilton, Ontario, Canada which will be the world's largest membrane facility (Constantine et al, 2010a). The T-MBR option was found to require significantly lower energy due to reduced oxygen demand and more efficient oxygen transfer characteristics.…”
Section: Mbr Configurationmentioning
confidence: 99%
“…Two treatment alternatives including the MBR/MF (MBR treating half of the primary effluent with a filtration system filtering nitrified secondary effluent from the existing system) and the Tertiary Nitrifying MBR (T-MBR, MBR to treat all the non-nitrified secondary effluent from the existing system) were selected for installation at the Woodward Avenue Wastewater Treatment Plant (WWTP) in Hamilton, Ontario, Canada which will be the world's largest membrane facility (Constantine et al, 2010a). The T-MBR option was found to require significantly lower energy due to reduced oxygen demand and more efficient oxygen transfer characteristics.…”
Section: Mbr Configurationmentioning
confidence: 99%