Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 12, July--September 1995

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

1996
1996
1996
1996

Publication Types

Select...
3

Relationship

3
0

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…As described during previous Quarterly Progress Reports [11,12,13,141 Preliminary results indicate some interesting relationships for the variables tested (feed rate, frother dosage, and air volume). It is generally considered that recovery increases with a decrease in feed rate, increase in frother, and increase in air volume.…”
Section: Subtask 32 Enqineerina Developmentmentioning
confidence: 52%
“…As described during previous Quarterly Progress Reports [11,12,13,141 Preliminary results indicate some interesting relationships for the variables tested (feed rate, frother dosage, and air volume). It is generally considered that recovery increases with a decrease in feed rate, increase in frother, and increase in air volume.…”
Section: Subtask 32 Enqineerina Developmentmentioning
confidence: 52%
“…As a practical matter, the particle size distributions of the two froth slurries did not differ very much [12]. A considerable amount of launder water was needed when producing the two slurries so they only contained 10-12 % solids.…”
Section: Vacuum Filter Dewaferinq Testsmentioning
confidence: 96%
“…As described during previous Quarterly Progress Reports [II,12,131, an existing 30-inch diameter MicroceP flotation column was refurbished and installed in the Lady Dunn Plant for this engineering development work. A highquality product, containing about 10% ash was produced at approximately 80% combustible matter recovery [I 31.…”
Section: Subtask 32 Engineerinq Developmentmentioning
confidence: 99%