Enhanced Subcontractors Allocation for Apartment Construction Project Applying Conceptual 4D Digital Twin Framework

Abstract: The problem of optimal allocation of resources in limited circumstances to handle assigned tasks has been dealt with in a wide variety of research fields. Various research methodologies have been proposed to address uncertainties such as waiting and waste in construction projects, but they do not take into account the complexity of construction production systems. In this study, a research approach was proposed that simplified the construction production system into a work package to be serviced and a work gro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 58 publications
(51 reference statements)
0
1
0
Order By: Relevance
“…Almost all of these studies were based on on-site case studies, except for [174][175][176], which fully or partially focused on the off-site production of modular pre-fabricated building components. The studies in this field were divided into the following groups: robotics in construction [177][178][179][180], safety management [52,[181][182][183][184][185][186][187][188][189][190][191][192][193][194][195][196], and project performance monitoring [45,126,[174][175][176]180,189,[197][198][199][200][201][202][203][204][205][206][207][208][209][210][211][212][213]…”
Section: Clustering Dt Studiesmentioning
confidence: 99%
“…Almost all of these studies were based on on-site case studies, except for [174][175][176], which fully or partially focused on the off-site production of modular pre-fabricated building components. The studies in this field were divided into the following groups: robotics in construction [177][178][179][180], safety management [52,[181][182][183][184][185][186][187][188][189][190][191][192][193][194][195][196], and project performance monitoring [45,126,[174][175][176]180,189,[197][198][199][200][201][202][203][204][205][206][207][208][209][210][211][212][213]…”
Section: Clustering Dt Studiesmentioning
confidence: 99%