2021
DOI: 10.3390/su13137014
|View full text |Cite
|
Sign up to set email alerts
|

Enhancing a Building Information Model for an Existing Building with Data from a Sustainable Facility Management Database

Abstract: This study investigates the feasibility and benefits of transferring data between Autodesk Revit (used for building information modeling (BIM)) and BUILDER SMS (used for sustainable facility management (SFM)). Two data transfer methods were evaluated using a case study; one involved entirely manual data transfer, the other a combination of manual and automatic. Of the data transfer methods evaluated, the manual/automated hybrid was determined to be the best option, especially when regular updates are envisione… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(12 citation statements)
references
References 38 publications
0
11
0
1
Order By: Relevance
“…According to Loeh et al [102], BIM can conduct space-related information collection and visualization demonstration of the space area, utilization status, and other relevant information for each functional area and floor. Based on this information, BIM can reflect the average expenditure per unit area, detailed analysis of costs, area occupied per person, and space utilization to achieve optimal space allocation and planning.…”
Section: Space Managementmentioning
confidence: 99%
See 2 more Smart Citations
“…According to Loeh et al [102], BIM can conduct space-related information collection and visualization demonstration of the space area, utilization status, and other relevant information for each functional area and floor. Based on this information, BIM can reflect the average expenditure per unit area, detailed analysis of costs, area occupied per person, and space utilization to achieve optimal space allocation and planning.…”
Section: Space Managementmentioning
confidence: 99%
“…Through BIM utilization, stakeholders can conveniently retrieve and utilize necessary information [111]. From the perspective of asset management, energy management, maintenance, and repair, with the integration of plugin and third-party equipment (RFID, barcode, and sensor), BIM can collect the necessary data (including material and energy consumption and inventory information, and the operational status of equipment) automatically and modify the corresponding bill of quantities [49][50][51]53,77,78,92,93,102,106].…”
Section: Knowledge Storage and Managementmentioning
confidence: 99%
See 1 more Smart Citation
“…Autodesk Revit is a BIM tool used by architects, landscape architects, structural engineers, mechanical, electrical and plumbing engineers, designers and contractors (Loeh et al , 2021).…”
Section: System Implementationmentioning
confidence: 99%
“…As shown in Figure 3, the system is implemented using BIM software (Autodesk Revit), system platform (AR SDK v1.8.0 and Unity 3 D version 2019.2.2f1) and databases (MS SQL, XAMPP, PHP). Autodesk Revit is a BIM tool used by architects, landscape architects, structural engineers, mechanical, electrical and plumbing engineers, designers and contractors (Loeh et al, 2021). Google's ARore (ARCore Overview) SDK v1.8.0 is its platform for building AR experiences (Tarek and Marzouk, 2022).…”
Section: System Implementationmentioning
confidence: 99%