2019
DOI: 10.30638/eemj.2019.113
|View full text |Cite
|
Sign up to set email alerts
|

Environmental Load Estimating Model for Natm Tunnel Using Case Based Reasoning in the Planning Stage of Tunnel Construction

Abstract: Energy and resource consumption in construction projects is one of major causes to global warming. In order to evaluate the environmental load of construction projects, previous approaches calculated the quantities of construction materials and energy consumption from the use of equipment based on detailed design information after the completion of design. As a result, it is difficult to estimate environmental loads prior to design completion. This study is to develop an estimating model which can assess envir… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles