2005
DOI: 10.2172/885977
|View full text |Cite
|
Sign up to set email alerts
|

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2007
2007
2020
2020

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 9 publications
0
4
0
Order By: Relevance
“…herbiola, H. scutatum, and Pseudotriton (albeit a separate species, P. ruber) each occur is in a portion of Bear Creek Valley that is also under strong consideration for development. Indeed, many of the associated wetlands in Bear Creek Valley were already lost or hydrologically compromised during development of the Environmental Management Waste Management Facility and the extension of the UPF Haul Road (Peterson et al 2005). Additional adjacent wetlands were compromised by construction of access roads during site characterization for the planned On-Site Waste Disposal Facility (OSWDF).…”
Section: Conclusion and Cultural Considerationsmentioning
confidence: 99%
“…herbiola, H. scutatum, and Pseudotriton (albeit a separate species, P. ruber) each occur is in a portion of Bear Creek Valley that is also under strong consideration for development. Indeed, many of the associated wetlands in Bear Creek Valley were already lost or hydrologically compromised during development of the Environmental Management Waste Management Facility and the extension of the UPF Haul Road (Peterson et al 2005). Additional adjacent wetlands were compromised by construction of access roads during site characterization for the planned On-Site Waste Disposal Facility (OSWDF).…”
Section: Conclusion and Cultural Considerationsmentioning
confidence: 99%
“…However, the project could not avoid impacting 1.35 acres of wetland habitat within the road corridor. Environmental surveys of the affected environment were described in Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMP) Haul Road Corridor (Peterson et al 2005).…”
Section: Emwmf Haul Road Mitigation Sitementioning
confidence: 99%
“…However, the project could not avoid impacting 1.35 acres of wetland habitat within the road corridor. Environmental surveys of the affected environment were described in Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor (Peterson et al 2005).…”
Section: -30 100mentioning
confidence: 99%