Estimating the Driven Pile Capacities for COF Project in West Kazakhstan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…Soil testing by static loads on piles is carried out in the following order [8][9][10][11][12][13]: the rest of the pile is maintained after the installation of the bored pile; testing of soils with bored piles begins not earlier than the pile concrete reaches 80% of the design strength; the pile is loaded with a static vertically indenting, stepwise increasing load, in steps; loading is performed by Three 500-ton hydraulic jacks model DG500G250; instrument reports are taken in the following sequence: the first report is taken immediately after the load is applied, then four readings every 15 minutes, two readings with an interval of 30 minutes and then after 60 minutes until conditional stabilization, that is, when the difference in displacements ΔS is not more than 0.1 mm for the last 1.00 hour of observation: the vertical load is brought to a value that causes the pile to move by at least 40mm or to the maximum load provided for by this program; unloading of the tested piles is carried out in steps equal to double the loading steps; readouts on strain gauges are taken immediately after each stage of unloading and observed after 15 minutes. After complete unloading (to zero), the elastic displacements are monitored for 1 hour with readings taken every 15 minutes.…”
Section: Methodologies Of the Pile Field Test (Slt) By Gostmentioning
confidence: 99%
“…Soil testing by static loads on piles is carried out in the following order [8][9][10][11][12][13]: the rest of the pile is maintained after the installation of the bored pile; testing of soils with bored piles begins not earlier than the pile concrete reaches 80% of the design strength; the pile is loaded with a static vertically indenting, stepwise increasing load, in steps; loading is performed by Three 500-ton hydraulic jacks model DG500G250; instrument reports are taken in the following sequence: the first report is taken immediately after the load is applied, then four readings every 15 minutes, two readings with an interval of 30 minutes and then after 60 minutes until conditional stabilization, that is, when the difference in displacements ΔS is not more than 0.1 mm for the last 1.00 hour of observation: the vertical load is brought to a value that causes the pile to move by at least 40mm or to the maximum load provided for by this program; unloading of the tested piles is carried out in steps equal to double the loading steps; readouts on strain gauges are taken immediately after each stage of unloading and observed after 15 minutes. After complete unloading (to zero), the elastic displacements are monitored for 1 hour with readings taken every 15 minutes.…”
Section: Methodologies Of the Pile Field Test (Slt) By Gostmentioning
confidence: 99%
“…Pile foundations are one of the most popular types of foundations at construction sites in Kazakhstan, the expediency of their use is due to the need to ensure a high load-bearing capacity of high-rise buildings and structures. In connection with the emergence of new technologies and equipment for the installation of pile foundations, designers need to improve the current regulatory documents, which, unfortunately, do not contain recommendations for the design of piles made using modern technologies [3].…”
Section: Introductionmentioning
confidence: 99%