2020
DOI: 10.1061/(asce)co.1943-7862.0001917
|View full text |Cite
|
Sign up to set email alerts
|

Ethnographic Research in the Construction Industry: A Critical Review

Abstract: A decade ago, there were multiple calls for more ethnographic research in the construction industry in order to provide deeper insights into industry practice. Since those calls, methods under the umbrella of ethnographic methods have been more regularly applied, with various data collection techniques being adopted, often as part of multi-faceted research designs. It is argued that it is now an appropriate time to critically review ethnographic research studies over the past ten years, in order to establish t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 21 publications
(11 citation statements)
references
References 100 publications
0
11
0
Order By: Relevance
“…Ethnographic methods are used to obtain a thick description of the elements that constitute a practice. Ethnographic interviewing is a non-participatory method that has a short involvement with the subject of interest (Oswald and Dainty, 2020). The method allowed us to explore the variety of boundary spanning roles from the insider-viewpoint of a coordinator.…”
Section: Methodsmentioning
confidence: 99%
“…Ethnographic methods are used to obtain a thick description of the elements that constitute a practice. Ethnographic interviewing is a non-participatory method that has a short involvement with the subject of interest (Oswald and Dainty, 2020). The method allowed us to explore the variety of boundary spanning roles from the insider-viewpoint of a coordinator.…”
Section: Methodsmentioning
confidence: 99%
“…Soon, some owners locate that the building managers as well may attempt to safeguard their own passion instead of that of the proprietors when the stakes are high. It ought to be noticeable to all involved in the construction process that the event which is needed to take greater risk demands larger incentives (Oswald & Dainty, 2020). If a proprietor wishes to involve an A/E company on the basis of reduced costs as opposed to recognized credentials, it commonly gets what it should have; or if the owner desires the general professional to bear the cost of unpredictability's in construction such as structure conditions, the agreement cost will be higher even if competitive bidding is utilized in reaching a legal agreement.…”
Section: Background Of the Studymentioning
confidence: 99%
“…Soon, some owners find that the structure supervisors too might attempt to guard their very own passion rather than that of the owners when the stakes are high. It should certainly be visible to all involved in the software program advancement process that the occasion which is required to take greater risk needs larger rewards (Oswald & Dainty, 2020).…”
Section: Background Of the Studymentioning
confidence: 99%