18th International Conference and Exhibition on Electricity Distribution (CIRED 2005) 2005
DOI: 10.1049/cp:20051308
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of alternative MV distribution network plans from reliability point of view

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2005
2005
2009
2009

Publication Types

Select...
4
1

Relationship

3
2

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 4 publications
0
4
0
Order By: Relevance
“…Many investigative studies concentrate on optimizing the performance of feeders operating at medium voltages such as 11 kV [1][2][3]. This may be because most of the consumer unavailability occurs at these voltage levels, and because such feeders tend to be similar to one another and can therefore be represented generically.…”
Section: Research Backgroundmentioning
confidence: 99%
“…Many investigative studies concentrate on optimizing the performance of feeders operating at medium voltages such as 11 kV [1][2][3]. This may be because most of the consumer unavailability occurs at these voltage levels, and because such feeders tend to be similar to one another and can therefore be represented generically.…”
Section: Research Backgroundmentioning
confidence: 99%
“…Some years ago a research project was carried out in order to develop reliability based network analysis at the Tampere University of Technology (TUT) in cooperation with utilities and software suppliers [1]. The project resulted in prototype software for reliability analysis as well as a great amount of knowledge about the factors affecting distribution network reliability in general [2,3].…”
Section: Reliability Based Network Analysis Toolmentioning
confidence: 99%
“…Improve minimum customer satisfaction index (CDI) in a system level and minimise SACDI Results for 1 and 2 target values are available directly from an RNA/AM analysis. More detailed information from used customer cost parameters can be found in [3].…”
Section: Long-term Planning : Regional Development Plan In Central Fimentioning
confidence: 99%
“…This kind of study is applicable for completely new medium voltage distribution network as well as for aged existing networks, which should be renovated. In Reference [7] the studies with small fictional network are presented. In the following chapter, study with alternative solutions for real networks is presented.…”
Section: Network Studiesmentioning
confidence: 99%