2021
DOI: 10.1108/ijicc-06-2021-0118
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of green building suppliers based on IVPLTS-CBR decision-making method

Abstract: PurposeThe purpose of this paper is to propose a multi-criteria decision-making model based on the case-based reasoning (CBR) method for interval-valued probabilistic linguistic term set (IVPLTS), which can cluster different categories of building suppliers for targeted management.Design/methodology/approachFirst, a new score function and distance measure for IVPLTS are proposed. Second, a green building supplier evaluation criterion system is constructed from five aspects: operation management, green manageme… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 43 publications
0
5
0
Order By: Relevance
“…In the sample of papers selected in this study, there are only a few papers that involved machine learning. From the perspective of maintenance and repair, case-based reasoning (CBR) modules in BIM can store and learn maintenance and repair cases and automatically match solutions to similar cases when the maintenance and repair personnel are encountered [12,[57][58][59][60]147]. Through the contribution of CBR, BIM can utilize this knowledge to competently assist personnel in conducting fault detection and diagnosis.…”
Section: Machine Learningmentioning
confidence: 99%
See 1 more Smart Citation
“…In the sample of papers selected in this study, there are only a few papers that involved machine learning. From the perspective of maintenance and repair, case-based reasoning (CBR) modules in BIM can store and learn maintenance and repair cases and automatically match solutions to similar cases when the maintenance and repair personnel are encountered [12,[57][58][59][60]147]. Through the contribution of CBR, BIM can utilize this knowledge to competently assist personnel in conducting fault detection and diagnosis.…”
Section: Machine Learningmentioning
confidence: 99%
“…The BIM-based CBR process has significant advantages in the quality improvement of maintenance and repair. In the process of conducting CBR, with the contribution of structured and graphical data in IFC, the CBR model can facilitate the FM (facility management) personnel to conduct an accurate cost estimate based on the best available match case [58]. FM stakeholders can select the specific component from the BIM, obtain the attributes associated with the corresponding component, utilize these data in the CBR model, and retrieve the most approximate case match [57].…”
mentioning
confidence: 99%
“…Suppliers closely related to core enterprises should establish environmental awareness and promote the development of a green supply chain. C5 is the most influential factor on the social level, and most processing enterprises tend to regard suppliers with a long-term willingness to cooperate as partners and establish strategic alliances with them [48].…”
Section: Key Factor Analysismentioning
confidence: 99%
“…Thus, if a common continuous variable validation, such as a t-test, is used in the comparison stage of efficiency between the groups in this study, the largest classification category will be represented as an open-end category with a value larger than a certain pre-set value. Hence, the t-test result will become significantly different [39,40], implying that it is inappropriate to apply continuous variable validation. Thus, it is appropriate to use a non-parametric test such as the Wilcoxon-Mann-Whitney test, based on rank order without distinguishing the values of categories.…”
Section: Wilcoxon-mann-whitney Testmentioning
confidence: 99%