Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion (MedPower 2016) 2016
DOI: 10.1049/cp.2016.1034
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of voltage stability applying n-1 criterion, albanian power system case study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…For the IEEE 39-bus system, the LQPN values of three lines are identifed to be above the cutof value, i.e., 0.1; these lines are set to be the most critical lines (weak lines) and are eliminated from the system. Te eliminated lines are e (3,4), e (8,9), and e (26,29), which defne the partition boundaries. However, these partition boundaries are unable to provide two or more partitions.…”
Section: Start Make a Order Table: Lqpn Values In Ascending Ordermentioning
confidence: 99%
See 1 more Smart Citation
“…For the IEEE 39-bus system, the LQPN values of three lines are identifed to be above the cutof value, i.e., 0.1; these lines are set to be the most critical lines (weak lines) and are eliminated from the system. Te eliminated lines are e (3,4), e (8,9), and e (26,29), which defne the partition boundaries. However, these partition boundaries are unable to provide two or more partitions.…”
Section: Start Make a Order Table: Lqpn Values In Ascending Ordermentioning
confidence: 99%
“…Te lines that show the large fuctuation of active and reactive power fow when subjected to sudden disturbance are critical. Tese lines are identifed using N − 1 contingency analysis in [29]. Power fow between-ness is used to calculate critical lines in [30].…”
Section: Introductionmentioning
confidence: 99%