2018
DOI: 10.1155/2018/2518209
|View full text |Cite
|
Sign up to set email alerts
|

Excavation Method of Reducing Blasting Vibration in Complicated Geological Conditions

Abstract: Drilling and blasting method as a common excavation method is widely used in the underground engineering construction. However, in the complicated geological conditions, the path of blasting excavation available has limitation, and then the larger blasting vibration is produced, which influence the stability and safety of the protected structure. To effectively reduce the blasting vibration by optimizing the blasting excavation method, firstly, the site test on blasting vibration is conducted to obtain the bla… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 29 publications
0
6
0
Order By: Relevance
“…e correction coefficient corresponding to λ � 0 and λ � 1 can be calculated using equation (7), and the result is shown in Figure 7.…”
Section: Correction Coefficient For Specific Chargementioning
confidence: 99%
See 1 more Smart Citation
“…e correction coefficient corresponding to λ � 0 and λ � 1 can be calculated using equation (7), and the result is shown in Figure 7.…”
Section: Correction Coefficient For Specific Chargementioning
confidence: 99%
“…e drill-and-blast method is one of the main methods of rock fragmentation [6][7][8][9]. When the drill-and-blast excavation method is used in excavation of deep mineral resources, rocks are fragmented under the coupled effect of high static stress and blastinginduced dynamic stress [8][9][10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…According to equation (16), adopting steel fiber concrete can improve the bond characteristic of the interface (σ 24hb ) and thus increases the safety distance of shotcrete. (2) Operation sequences in tunnel excavation can be ordered to reduce blast charge and therefore significantly controls blast vibration [21,44]. A certain distance should be kept between upper and lower benches to keep the shotcrete from being repeatedly disturbed by blasting in a short time.…”
Section: Recommendations For the Security Of Shotcretementioning
confidence: 99%
“…In general, the safety of shotcrete subjected to blast vibration is affected by blast parameters, geological characteristics, and distance between blast and observation points [21]. It can also be determined by the failure criteria of shotcrete.…”
Section: Introductionmentioning
confidence: 99%
“…Li and Li [20] used the finite element method to compare and analyze the CD method, the step method, and the reserved core soil in the blasting excavation method and determined the damping excavation method for shallow buried tunnels crossing dense residential areas. Xie et al [21] used LS-DYNA software to simulate six different types of blasting excavation methods. By analyzing them, a reasonable blasting excavation method was proposed to reduce blasting vibration.…”
Section: Introductionmentioning
confidence: 99%