Proceedings of SPE/IADC Drilling Conference 2005
DOI: 10.2523/91923-ms
|View full text |Cite
|
Sign up to set email alerts
|

Expandable Liner Installation Avoids Sidetracking Following Production Casing Failure in the Gulf of Mexico

Abstract: fax 01-972-952-9435. AbstractDuring initial completion operations on a deepwater subsea oil well in the Gulf of Mexico, the 7-3/4 in., 46.1 lb/ft casing failed the pressure test in the production liner. Subsequent operations located the casing leak 1,800 ft above the target completion intervals. The original completion was planned to be a stacked, commingled frac pack with reservoir depths over 23,000 feet and pressures over 14,500 psi.To best address the problem and maintain the original well objectives, a so… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance