2022 International Conference on Smart Energy Systems and Technologies (SEST) 2022
DOI: 10.1109/sest53650.2022.9898480
|View full text |Cite
|
Sign up to set email alerts
|

Experimental Validation of the Parallel Operation of Grid-Forming Converters and Synchronous Generators in Temporary Islanded Microgrids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…been used for investigating the impact of distributed generation unit controls on the stability and dynamics of islanded microgrids [42]. As an example, [43] shows the use case of testing a grid-forming converter control operated in parallel with a synchronous generator in an islanded configuration of the low voltage grid. Furthermore, the coordinated flexibility provision by several generation units has been demonstrated [44].…”
Section: Distribution Grid Laboratorymentioning
confidence: 99%
“…been used for investigating the impact of distributed generation unit controls on the stability and dynamics of islanded microgrids [42]. As an example, [43] shows the use case of testing a grid-forming converter control operated in parallel with a synchronous generator in an islanded configuration of the low voltage grid. Furthermore, the coordinated flexibility provision by several generation units has been demonstrated [44].…”
Section: Distribution Grid Laboratorymentioning
confidence: 99%