2017
DOI: 10.1088/1742-6596/890/1/012154
|View full text |Cite
|
Sign up to set email alerts
|

Extraction method of extreme rainfall data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…While interpretation of the plots is not always easy, we selected the appropriate thresholds (Figs. A1 and A2) based on their convergence to the optimal values of the four graphical representations, as done in similar situations in previous works (Anagnostopoulou and Tolika, 2012;Zakaria et al, 2017).…”
Section: Return Periods Of Highest Probabilities Of Flow Generationmentioning
confidence: 88%
“…While interpretation of the plots is not always easy, we selected the appropriate thresholds (Figs. A1 and A2) based on their convergence to the optimal values of the four graphical representations, as done in similar situations in previous works (Anagnostopoulou and Tolika, 2012;Zakaria et al, 2017).…”
Section: Return Periods Of Highest Probabilities Of Flow Generationmentioning
confidence: 88%
“…The target temperatures for T3 and T6 were manipulated based on the 90th and 99th percentiles of the daily maximum temperature at the study site during the reference period (1961-2019) [38]. For the DR treatment, we considered the longest consecutive days with rainfall <1 mm during the reference period [39], and the HR treatment was produced using the 95th percentile of daily precipitation [40,41]. Consequently, the DR treatment lasted for nine days during the reference period, and the threshold of HR treatment was 113 mm per day [42].…”
Section: Experimental Designmentioning
confidence: 99%
“…An intense precipitation event is defined as the exceedance of a threshold that corresponds to the daily rainfall amount exceeding a given value during the study period [31]. Here, the extreme value was defined by using percentiles that are statistical quantities [3,11,[32][33][34][35]. However, there is no fixed value chosen for all months.…”
Section: Methodsmentioning
confidence: 99%