2019
DOI: 10.1051/matecconf/201927702022
|View full text |Cite
|
Sign up to set email alerts
|

Facility management and building information modeling during operation and maintenance

Abstract: BIM is a concept and also a method currently applied throughout the world in the modern building construction. The impact and benefits of the BIM method are clear across all stages of the life cycle of buildings (project, realization, operation, demolition). The longest and most expensive phase of buildings life is the operation and usage part. Many common aspects and linkage of processes between the BIM method and the facility management, i.e. a modern asset management method, can provide greater efficiency f… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 4 publications
0
3
0
1
Order By: Relevance
“…A O&M são intrinsecamente relacionadas (DON, 2011) e compõem as etapas mais longas do ciclo de vida das edificações, logo, quão mais eficiente a gestão desse período, maior a vida útil e mais sustentáveis serão as edificações (CHEN et al, 2018;FALTEJSEK;CHUDIKOVA, 2019;PENG et al, 2017). Os dados gerados durante essas fases são úteis para auxiliar a gestão das instalações (PENG et al, 2017).…”
Section: O Bim Para Gestão Operação E Manutenção De Instalaçõesunclassified
“…A O&M são intrinsecamente relacionadas (DON, 2011) e compõem as etapas mais longas do ciclo de vida das edificações, logo, quão mais eficiente a gestão desse período, maior a vida útil e mais sustentáveis serão as edificações (CHEN et al, 2018;FALTEJSEK;CHUDIKOVA, 2019;PENG et al, 2017). Os dados gerados durante essas fases são úteis para auxiliar a gestão das instalações (PENG et al, 2017).…”
Section: O Bim Para Gestão Operação E Manutenção De Instalaçõesunclassified
“…To upgrade this somewhat outdated way of information management, BIM has been identified as a key method in the AEC industry to transform the traditional FM processes [27]. For instance [28,29], outlined BIM benefits in the areas of knowledge capture, early FM engagement, supporting hard and soft services and strategic FM, and accessing real-time data. Specific to O&M work order management [30], proposed computer maintenance management systems (CMMSs) to record information such as service requests and work orders for convenient execution for FM professionals.…”
Section: Bim-enabled Fmmentioning
confidence: 99%
“…This process will be initiated by setting up the consultation agreement between the client/owner and their AM team and the DEC. This step is assuming that the client AM team does not have enough BIM skills to manage the COBie workflow in-house which is the current reality in most of the FM and AM companies (Faltejsek and Chudikova, 2019). However, if the client has their own BIM specialist that can manage the COBie workflow, then this specialist will act as the DEC in this process model (Figure 7).…”
Section: Lifecycle Exchange Of Asset Data Process 1 -Project Management Institute Initiation Phasementioning
confidence: 99%
“…Getting the client team or their digital consultant involved at this early stage is also aligned with the government soft landings, and it helps the supply chain have the right expectations about the data delivered to operation team, and ensures the data are suitable to support AM (Faltejsek and Chudikova, 2019). The DES then (on behalf of the client) performs the first quality check for the COBie Drop 1 to make sure the naming convention for floors is consistent because this will allow the supply chain to use consistent naming of the levels and avoid duplicate naming.…”
Section: Lifecycle Exchange For Asset Datamentioning
confidence: 99%