Factors Affecting Cost Overruns in Micro-scaled Construction Companies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 18 publications
(11 citation statements)
references
References 10 publications
0
11
0
Order By: Relevance
“…Cheng (2014) [11] presents a research result in which change in scope and cost control are the most relevant causes. Already Polat et al (2014) [12] identified project changes and delays in project approval as more critical factors. These two studies present very similar results with the present study.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Cheng (2014) [11] presents a research result in which change in scope and cost control are the most relevant causes. Already Polat et al (2014) [12] identified project changes and delays in project approval as more critical factors. These two studies present very similar results with the present study.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Many construction projects are facing serious cost overruns due to various reasons [12]. According to the research carried out by Moms and Hough, the vast majority (63%) of 1778 building projects financed by the World Bank in 1974-1988 exceeded their budget [9].…”
Section: Cost Overruns In Construction Projectsmentioning
confidence: 99%
“…A construction project is commonly acknowledged as a successful project when the aim of the project is achieved in terms of predetermined objectives of completing the project on time, within budget, and to the required quality standard (Kesavan et al, 2015). To achieve this goal, construction companies should complete the projects within their anticipated budgets and durations, and expected quality targets (Polat et al, 2014). However, in most construction projects severe time and cost overruns occur due to various factors (Arditi et al, 2017;Habibi and Kermanshachi, 2018;Ogbu and Adindu, 2019).…”
Section: Introductionmentioning
confidence: 99%