Blucher Engineering Proceedings 2020
DOI: 10.5151/siintec2020-feasibilityanalysis
|View full text |Cite
|
Sign up to set email alerts
|

Feasibility Analysis on the Construction of a Solution for Monitoring and Hydrometeorological Forecasting

Abstract: The management of water resources, today, is still a global challenge. Current climate models are not yet capable of satisfactorily representing interannual climate variations caused by atmospheric oscillations. Thus, the better representation of water resources issues requires data related to the variables involved with better quality, as well as the establishment of methodologies that demonstrate how these data relate to observed and expected climatic variations. In this context, the WRF-Hydro system represe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…These models will also be costly during the training process, but assuming a sufficiently large amount of data, with proper processing of features, can be generalized proving a good accuracy and not being restricted to a period. With this, it is possible to integrate an AI module into the proposed architecture in [43] containing previously trained models and the possibility of managing algorithms to perform validations and study of comparations between these approaches and the results of the WRF-Hydro model, in the short and mediumterm, proving knowledge for long-term evaluations, optimizing the time and cost of in.…”
Section: Ai Application Modulementioning
confidence: 99%
“…These models will also be costly during the training process, but assuming a sufficiently large amount of data, with proper processing of features, can be generalized proving a good accuracy and not being restricted to a period. With this, it is possible to integrate an AI module into the proposed architecture in [43] containing previously trained models and the possibility of managing algorithms to perform validations and study of comparations between these approaches and the results of the WRF-Hydro model, in the short and mediumterm, proving knowledge for long-term evaluations, optimizing the time and cost of in.…”
Section: Ai Application Modulementioning
confidence: 99%