Feasibility Study on the Selection of Phase Design and Overhead Line Wire Cross-Section

Abstract: The paper analyzes the existing method of choosing the cross-section of wires by the method of an interval of economic curves. It is shown that the cross-section of the wires and the design parameters of the lines must correspond to the ratio between the cost of construction and the cost of optimizing the design of phase wires. The algorithm of application of this method for 330 kV power transmission lines with split phase is substantiated. A current load search algorithm has been developed and proposed, in wh… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?