Petroleum Engineer's Guide to Oil Field Chemicals and Fluids 2015
DOI: 10.1016/b978-0-12-803734-8.00009-6
|View full text |Cite
|
Sign up to set email alerts
|

Filter cake removal

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 11 publications
0
1
0
Order By: Relevance
“…However, after the drilling operations, the drilling fluids and the filter cake film must be removed from the wellbore to enable a successful primary cementing job. Also, filter cake removal is mandatory before the start of production operations to avoid impeding the flow capacity at the wellbore [21]. The preflush fluids are designed to be injected after the drilling operation and before injecting the cement slurry to thoroughly wipe the remaining mud in the annular space [22].…”
Section: Introductionmentioning
confidence: 99%
“…However, after the drilling operations, the drilling fluids and the filter cake film must be removed from the wellbore to enable a successful primary cementing job. Also, filter cake removal is mandatory before the start of production operations to avoid impeding the flow capacity at the wellbore [21]. The preflush fluids are designed to be injected after the drilling operation and before injecting the cement slurry to thoroughly wipe the remaining mud in the annular space [22].…”
Section: Introductionmentioning
confidence: 99%