Day 3 Wed, November 13, 2019 2019
DOI: 10.2118/197274-ms
|View full text |Cite
|
Sign up to set email alerts
|

First CO2-EOR Project of the Middle East, Lessons Learnt and Future Plan after Two Years of Injection

Abstract: Experiences gained from CO2 flooding to improve oil recovery worldwide indicates that considerable amount of remaining oil can be recovered with miscible CO2 injection under appropriate conditions. Though its performance in the heterogeneous Middle Eastern carbonate reservoirs has not been well demonstrated yet, it is most likely going to be the future hydrocarbons recovery process in Abu Dhabi after the successful implementation of the first miscible CO2-EOR pilot in 2009 by ADNOC Onshore. In 2016, ADNOC Onsh… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…The static mixer was also covered with a blind flange, while the CO 2 was diverted through a larger port before it entered into the static mixer. Supercritical CO 2 injection in the Abu Dhabi carbonate formation also led to ravaging tubing corrosion . Excessive corrosion also occurred during a similar injection in the Bati Raman project .…”
Section: Challenges Life Cycle Assessment and Outlook Of Cwimentioning
confidence: 95%
See 1 more Smart Citation
“…The static mixer was also covered with a blind flange, while the CO 2 was diverted through a larger port before it entered into the static mixer. Supercritical CO 2 injection in the Abu Dhabi carbonate formation also led to ravaging tubing corrosion . Excessive corrosion also occurred during a similar injection in the Bati Raman project .…”
Section: Challenges Life Cycle Assessment and Outlook Of Cwimentioning
confidence: 95%
“…Supercritical CO 2 injection in the Abu Dhabi carbonate formation also led to ravaging tubing corrosion. 181 Excessive corrosion also occurred during a similar injection in the Bati Raman project. 182 appropriate materials and careful monitoring (using inflow control devices (ICDs) in production and injection wells).…”
Section: Challenges Life Cycle Assessment Andmentioning
confidence: 96%