2021
DOI: 10.21203/rs.3.rs-235736/v1
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

First Simultaneous Detection of Electron and Positron Bunches at the Positron Capture Section of the SuperKEKB Factory

Abstract: The direct simultaneous detection of electron and positron bunch signals was successfully performed for the first time with wideband pickups and a detection system at the positron capture section of the SuperKEKB factory. The time interval between the electron and positron bunches, their bunch lengths, and bunch intensities depending on the phase of accelerating structures were measured to investigate their capture process and to maximally optimize the positron intensity. The results show that the time interva… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 5 publications
(5 reference statements)
0
2
0
Order By: Relevance
“…The main limit in conventional sources is the heat load on the target which limits the power of the primary beam. The SuperKEKB positron source is the highest intensity positron source in operation, thanks to improvements on the drive beam parameters, the flux concentrator used to capture the beam and improvements in the positron line diagnostics [20,21].…”
Section: Positron Sources For High Energy Physics Colliders: Requirem...mentioning
confidence: 99%
“…The main limit in conventional sources is the heat load on the target which limits the power of the primary beam. The SuperKEKB positron source is the highest intensity positron source in operation, thanks to improvements on the drive beam parameters, the flux concentrator used to capture the beam and improvements in the positron line diagnostics [20,21].…”
Section: Positron Sources For High Energy Physics Colliders: Requirem...mentioning
confidence: 99%
“…• Development of the very fast response BPM [50]. It allowed monitoring the positron beam in the beginning of the capture section.…”
Section: Most Performing Positron Source In Operation: Superkekbmentioning
confidence: 99%