2019
DOI: 10.21315/jps2019.30.s1.8
|View full text |Cite
|
Sign up to set email alerts
|

Flared Gas Emission Control from an Oil Production Platform

Abstract: In Samarang oil platform of Repsol (Talisman) Malaysia Limited, there is a need to increase its current oil production that would result in an increase of the associated/excess gas from 21 mmscfd to 31 mmscfd. The current low-pressure gas system on the platform is designed to accommodate up to 21 mmscfd of gas. The excess produced gas of 10 mmscfd, if not re-injected back into the reservoir, shall need to be flared on a daily basis in order to maximise the oil production rate. This gas flaring expends large am… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
references
References 23 publications
0
0
0
Order By: Relevance