2020
DOI: 10.37798/202069453
|View full text |Cite
|
Sign up to set email alerts
|

Fleet Asset Management Opportunities Arising from Transient Monitoring of Power Transformers and Shunt Reactors

Abstract: Power transformers and shunt reactors are strategic assets for every system operator and their downtime should be kept as low and controlled as possible. During their multi-decade service life, they are regularly exposed to transient overvoltages. These situations stress their insulation systems and can cause accelerated deterioration and aging. Since the shapes of these overvoltages are usually unknown, an additional approach to assessing the health index can be realized using monitoring systems with transien… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…The system is already installed and operates on different locations in Croatian transmission system. The performance check of the system has been done in both frequency and time domain [10], [16]. In [16], the system was tested in the high voltage laboratory for SI, LI and LIC on 100 MVAr 220 kV shunt reactor, while in [10] the system was tested against the simulation results of transferred overvoltage, caused by lightning.…”
Section: Continuous Overvoltage Monitoring In Power Networkmentioning
confidence: 99%
See 3 more Smart Citations
“…The system is already installed and operates on different locations in Croatian transmission system. The performance check of the system has been done in both frequency and time domain [10], [16]. In [16], the system was tested in the high voltage laboratory for SI, LI and LIC on 100 MVAr 220 kV shunt reactor, while in [10] the system was tested against the simulation results of transferred overvoltage, caused by lightning.…”
Section: Continuous Overvoltage Monitoring In Power Networkmentioning
confidence: 99%
“…The performance check of the system has been done in both frequency and time domain [10], [16]. In [16], the system was tested in the high voltage laboratory for SI, LI and LIC on 100 MVAr 220 kV shunt reactor, while in [10] the system was tested against the simulation results of transferred overvoltage, caused by lightning. The simulation included wideband black box power transformer model in EMTP.…”
Section: Continuous Overvoltage Monitoring In Power Networkmentioning
confidence: 99%
See 2 more Smart Citations