2016
DOI: 10.17485/ijst/2016/v9i42/101905
|View full text |Cite
|
Sign up to set email alerts
|

Flexible Flowshop Scheduling Model with Four Stages

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Consider ten jobs and four stages, with each stage having 4 parallel, uniform machines (Table VII) (Tyagi, 2016).…”
Section: Illustrative Examplementioning
confidence: 99%
See 3 more Smart Citations
“…Consider ten jobs and four stages, with each stage having 4 parallel, uniform machines (Table VII) (Tyagi, 2016).…”
Section: Illustrative Examplementioning
confidence: 99%
“…The Construction Algortihm used (Tyagi, 2016) assigned to these four separate problems using MPTSA (Tyagi, 2016). LPT is then used in each individual flowshop to schedule the respective jobs.…”
Section: Illustrative Examplementioning
confidence: 99%
See 2 more Smart Citations