SEG Technical Program Expanded Abstracts 1999 1999
DOI: 10.1190/1.1820841
|View full text |Cite
|
Sign up to set email alerts
|

Foinaven active reservoir management : Towed streamer and buried sea‐bed detectors in deep water for 4D seismic

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2000
2000
2015
2015

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 12 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…This system consists of five permanently installed seabed cables in the southern fault block (Panel 4) of the field and is supplemented with surface towed streamer data (Cooper et al 1999c). A base line survey over Panel 4 was acquired before production in 1995 and repeated in 1998 after ten months of production.…”
Section: Post Discoverymentioning
confidence: 99%
“…This system consists of five permanently installed seabed cables in the southern fault block (Panel 4) of the field and is supplemented with surface towed streamer data (Cooper et al 1999c). A base line survey over Panel 4 was acquired before production in 1995 and repeated in 1998 after ten months of production.…”
Section: Post Discoverymentioning
confidence: 99%