2023
DOI: 10.3390/soc13100219
|View full text |Cite
|
Sign up to set email alerts
|

Forecasting Construction Cost Index through Artificial Intelligence

Bilal Aslam,
Ahsen Maqsoom,
Hina Inam
et al.

Abstract: This study presents a novel approach for forecasting the construction cost index (CCI) of building materials in developing countries. Such estimations are challenging due to the need for a longer time, the influence of inflation, and fluctuating project prices in developing countries. This study used three techniques—a modified Artificial Neural Network (ANN), time series, and linear regression—to predict and forecast the local building material CCI in Pakistan. The predicted CCI is based on materials, includi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 46 publications
0
3
0
Order By: Relevance
“…The authors in [22] stated that the optimal combination of scheduled and unscheduled maintenance to ensure occupant contentment is an appropriate solution. The majority of the studies, such as the one estimating the early cost of a concrete bridge using an ANN model [23], and a study by [24] identifying the ANN as an effective method, focus on cost estimation, including predicting the Construction Cost Index (CCI). An integration model of an ANN and AHP, developed by [25], was employed to estimate the cost of road networks, and [26] utilized an ANN to predict the final cost of the construction project.…”
Section: Rehabilitation Selection Methodsmentioning
confidence: 99%
“…The authors in [22] stated that the optimal combination of scheduled and unscheduled maintenance to ensure occupant contentment is an appropriate solution. The majority of the studies, such as the one estimating the early cost of a concrete bridge using an ANN model [23], and a study by [24] identifying the ANN as an effective method, focus on cost estimation, including predicting the Construction Cost Index (CCI). An integration model of an ANN and AHP, developed by [25], was employed to estimate the cost of road networks, and [26] utilized an ANN to predict the final cost of the construction project.…”
Section: Rehabilitation Selection Methodsmentioning
confidence: 99%
“…MC can foster superior reverse logistics compared to traditional construction by utilizing technological advancements like artificial intelligence, digital twins, and the Internet of Things (IoT) [105][106][107]. MC favors material traceability due to labeling its components during production, digital documentation through IoT, or material passports, which aids the reverse logistics of building components at EoL [105].…”
Section: Conceptual Framework For Mitigating Climate Change Through M...mentioning
confidence: 99%
“…Artificial Neural Networks (ANNs) are increasingly utilized in the construction industry, capitalizing on their capabilities in pattern recognition, predictive modeling, and decision-making support. Numerous researchers have employed ANNs to estimate project costs and facilitate budget allocation [15][16][17][18][19][20][21][22][23], as well as to enhance project scheduling [24][25][26][27][28]. The process of designing, training, and using Artificial Neural Networks (ANNs) involves several key stages, each contributing to the network's ability to perform tasks such as classification, regression, prediction, and more.…”
Section: The Applications Of Artificial Neural Network (Anns) In the ...mentioning
confidence: 99%