2019
DOI: 10.3390/su11247181
|View full text |Cite
|
Sign up to set email alerts
|

Forecasting Repair Schedule for Building Components Based on Case-Based Reasoning and Fuzzy-AHP

Abstract: Building maintenance is closely related to the performance and sustainability of buildings. However, existing approaches to maintenance are limited in terms of estimating required repairs. Therefore, this study proposes a case-based reasoning (CBR)-based model for estimating the time when the first repair will be needed after the completion of construction, even in phases where maintenance-related information is scarce. CBR and fuzzy-analytic hierarchy process (AHP) were employed as research methodologies. A d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 12 publications
(8 citation statements)
references
References 52 publications
0
7
0
1
Order By: Relevance
“…Many of the previous studies used AHP [ 38 , 39 , 40 ]. The differences between the existing studies using AHP and this study are as follows.…”
Section: Methodsmentioning
confidence: 99%
“…Many of the previous studies used AHP [ 38 , 39 , 40 ]. The differences between the existing studies using AHP and this study are as follows.…”
Section: Methodsmentioning
confidence: 99%
“…An interesting approach for determining the repair schedule of building components based on Case-Based Reasoning (CBR) and Fuzzy Analytic Hierarchy Process (FAHP) was proposed by Park et al [63]. Using a database of maintenance records of 257 components of residential buildings, and expert knowledge to derive attributes, the authors were able to predict the timing of first repairs to particular building components with a satisfactory precision.…”
Section: Decision-support Methods In Building Renewal and Capital Improvement Planningmentioning
confidence: 99%
“…Studi ini difokuskan pada fase mengambil dan menggunakan kembali karena mereka fase penting dari CBR. Fase merevisi dan mempertahankan (retaining) akan dibahas dalam studi masa depan [18].…”
Section: Pendahuluanunclassified