2020
DOI: 10.23968/1999-5571-2020-17-2-252-263
|View full text |Cite
|
Sign up to set email alerts
|

Formation of additional effect at management of the investment project cost at the expense of reengineering measures

Abstract: The processes of design, construction and operation of the capital construction project take place in a constantly changing environment, both internal and external. Such fluctuations require a quick and adequate response, which indicates the need to use a new organizational and economic mechanism, which is project management. The above mentioned factors have a significant impact on the final performance indicators of the investment project. Special attention is paid to considering the reengineering measures.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0
2

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 0 publications
0
1
0
2
Order By: Relevance
“…-firstly, spasmodic changes in the scientific and technical sphere (the so-called change in the technological order); -secondly, the complication of construction tasks, as well as their practical implementation; -thirdly, the simultaneous manifestation of such phenomena as the deepening of specialization, the strengthening of cooperation, and, on the other hand, convergence (territorial, organizational, technological). The superposition and interaction of these factors led to the emergence of new organizational schemes for managing investment and construction activities and new approaches to the operation of a capital construction facility [13,14]. This, in turn, causes transformations in the interactions of participants at the stages of the life cycle of a capital construction object, including in the event of conflict (controversial) situations.…”
Section: Resultsmentioning
confidence: 99%
“…-firstly, spasmodic changes in the scientific and technical sphere (the so-called change in the technological order); -secondly, the complication of construction tasks, as well as their practical implementation; -thirdly, the simultaneous manifestation of such phenomena as the deepening of specialization, the strengthening of cooperation, and, on the other hand, convergence (territorial, organizational, technological). The superposition and interaction of these factors led to the emergence of new organizational schemes for managing investment and construction activities and new approaches to the operation of a capital construction facility [13,14]. This, in turn, causes transformations in the interactions of participants at the stages of the life cycle of a capital construction object, including in the event of conflict (controversial) situations.…”
Section: Resultsmentioning
confidence: 99%
“…Как было установлено [1][2][3][4][5][6], необходимость иерархического построения систем управления объективна. Однако строительная компания обрывает ряд социально-экономических систем, в которых она существует, таким образом, заканчивается и любая иерархия управления, когда достигает уровня, который рассматривается как «конечная инстанция».…”
Section: ре зультаты исследованияunclassified
“…Указанные составляющие бизнес-процессов находятся между собой во взаимодействии, которое впоследствии определяет характер реинжиниринговых мероприятий данного направления [5,6]. Так, например, полная или частичная автоматизация процедур в рамках бизнес-процесса напрямую влияет на время исполнения (оно сокращается) и на квалификационный уровень и численность административно-управленческого персонала (квалификационные требования повышаются, а численность снижается) [7,8].…”
Section: ре зультаты исследованияunclassified