2020
DOI: 10.1002/geot.202000013
|View full text |Cite
|
Sign up to set email alerts
|

Forrestfield Airport Link Project – Challenges and TBM solution

Abstract: A large number of successfully completed tunnelling projects in sensitive environments and airport areas show the highest technical and quality standards of mechanized tunnelling technology, mastering project challenges and individual tasks in the interest of customers, clients and the environment. The Forrestfield Airport Link, currently under construction in Perth, Australia, is one of these projects tackling challenges in an airport area sensitive to any kind of settlement and subsurface conditions. The pap… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The development of the Variable Density TBM (Figure 1), which allows flexible switching between tunnelling modes, extends the capabilities of mechanised tunnelling and enables underground infrastructures to be cons tructed even in very heterogeneous ground -from solid rock to cohesive, coarsegrained and highly permeable soil above and below the water table [3].…”
Section: Areas Of Application and Design Featuresmentioning
confidence: 99%
“…The development of the Variable Density TBM (Figure 1), which allows flexible switching between tunnelling modes, extends the capabilities of mechanised tunnelling and enables underground infrastructures to be cons tructed even in very heterogeneous ground -from solid rock to cohesive, coarsegrained and highly permeable soil above and below the water table [3].…”
Section: Areas Of Application and Design Featuresmentioning
confidence: 99%