Frequency restoration reserves procurement with HVDC systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The preventive redispatch cost is taken as 1.5 times the dispatch cost for all generators. The generator curative redisptach cost for different contingencies is taken as five times the dispatch cost [27]. A high demand curtailment cost of 5,000 e/MWh is considered to discourage load shedding and only use it in extreme cases [28].…”
Section: Test System and Assumptionsmentioning
confidence: 99%
“…The preventive redispatch cost is taken as 1.5 times the dispatch cost for all generators. The generator curative redisptach cost for different contingencies is taken as five times the dispatch cost [27]. A high demand curtailment cost of 5,000 e/MWh is considered to discourage load shedding and only use it in extreme cases [28].…”
Section: Test System and Assumptionsmentioning
confidence: 99%